
Careers and Business
A Wind Farm brings many direct opportunities for employment to the region during both the construction phase and ongoing operations once the project is commissioned.
MoreType: Wind Farm
Phase: In Development
Thangool, QLD
Wind Capacity
225
MW
Battery Size
225
MW
Area
14,000
ha

OX2 is planning the Kariboe Wind Farm and Battery, featuring a 225 MW wind farm and a Battery Energy Storage System (BESS) up to 225 MW with a duration of up to 4 hours.
OX2 acquired the Project from BayWa r.e. in mid 2025.
The Project area spans approximately 14,000ha, however, the Project footprint represents a small portion of that area. The BESS approximately 7ha for the BESS.
The site is located approximately 35 kilometres southeast of Biloela and 35 kilometres northwest of Monto in central Queensland, on private land.
The Project will connect to QLD’s electricity network via a switching station linked to the existing 275kV Calvale to Halys double circuit transmission line. No additional line is required to connect the Project to the existing network.
We are currently in the early stages of the Project's development and anticipate starting construction in 2028 and operations in 2031
Learn More

A Wind Farm brings many direct opportunities for employment to the region during both the construction phase and ongoing operations once the project is commissioned.
More
OX2 Australia is proud to announce the launch of its first Reflect Reconciliation Action Plan (RAP), marking an important milestone in our commitment to reconciliation and building respectful relationships with Aboriginal and Torres Strait Islander peoples and communities.
More
The 2026 Callide Valley Show provided a valuable opportunity to celebrate the people, industries and traditions that help make the region strong, with OX2 proud to support this year's Droughtmaster Feature Show.
MoreJoin the Conversation

We want to share information about the project, explain any potential impacts, hear your thoughts, answer your questions, and keep you updated every step of the way.
More
OX2 welcome enquiries and feedback regarding the Kariboe wind farm and battery project.
MoreOX2 is the leading developer of onshore wind in Europe. As an industry pioneer, we are active in eleven markets and offer fully customised renewable energy solutions involving several technologies, including wind and solar energy, in addition to hydrogen and energy storage projects. We design and build sustainable projects and tailor them to meet our customers’ needs. OX2 has a proven business model and in-house expertise at every step of the process – from project inception and financing to engineering and design, permitting, procurement, construction, and technical and commercial management. Our mission is to accelerate access to renewable energy. We see ourselves becoming the leading provider of renewable energy solutions globally, thereby powering the great shift.
Wind farms generate electricity from the power of the wind. Wind is an inexhaustible resource that is clean, reliable and affordable. In 2023, 38.6% of Australia’s total electricity generation was from renewable energy sources, including solar (18.05%), wind (13.25%) and hydro (7.3%).

BESS facilities generally use lithium-ion to store the electricity until it is ready to be distributed to the network. BESS facilities allow energy generated from another source (such as a wind farm) to be stored until it is needed. BESS facilities improve grid reliability by storing low-cost electricity when there is an oversupply of electricity or during periods of low demand/high generation so that electricity is available when demand is higher. In fact, BESS can reduce electricity costs for communities by lowering peak demand charges and providing access to cheaper off-peak electricity. The fast response capability of BESS also enables ancillary services to maintain grid power quality at a standard level. Additionally, BESS can act as a backup power source during emergencies like bushfires, ensuring that critical infrastructure (hospitals, emergency services, water systems) remains operational even if the grid is disrupted.
BESS facilities contain several key components, including battery units, inverters and transformers. The final composition of a BESS facility will depend on the BESS technology used, the BESS supplier, and the facility's size. Where possible, BESS facilities are co-located with or near a grid connection point (such as a terminal station), therefore minimising the need for additional connection infrastructure.
Large-scale BESS facilities are expected to have an operational life of approximately 15 to 20 years and are typically monitored remotely, without the need for permanent on-site staff. Staff are, however, required to access the site from time to time to undertake inspection and maintenance activities.

OX2 has engaged Attexo to prepare a Social Impact Assessment (SIA). This assessment will help us understand community values, potential impacts, benefits, and perceptions about the project. Your feedback will help us deliver a project that benefits the region and respects community values.
See all news